The SGT5-2000E
is an extremely well-proven machine for simple
or combined-cycle processes with or without
combined heat and power, and for all load ranges,
particularly peak-load operation.
For Integrated Coal Gasification Combined Cycle
(IGCC) applications we offer our SGT5-2000E(LC)
machine.
The SGT5-2000E has a record for toughness and
durability with more than 120 units in operation
accounting for approximately 70,000 starts and
more than 4,000,000 operating hours.
Technical features:
Horizontally split casing
Two walk-in combustion chambers for hot-gas-path
inspection without cover lift
Combustion chambers lined with individually
replaceable ceramic tiles
16-stage axial-flow compressor with variable-pitch
inlet guide vanes
Optional fast inlet guide vanes for peak load
operation and frequency stabilization
Four stage turbine
All blades removable with rotor in place
Hybrid burners for premix and diffusion mode
operation with natural gas, fuel oil and special
fuels such as heavy oil and refinery residues
Low-NOx combustion system
|

Power Output = 168
MW
Efficiency = 34.7 %
Heat Rate = 10.366 kJ/kWh
=
9.825 Btu/kWh
|